The smooth completion of a membrane structure project is worthy of joy, but we cannot ignore the safety maintenance work of the membrane structure project. If you want to avoid all kinds of maintenance in the later stage and save maintenance costs, you must arrange the preventive preparations in the early stage. As an experienced membrane structure manufacturer, Shanghai Shows A Membrane Structure Co., Ltd. has a high-quality after-sales service team to provide quality after-sales maintenance work.
Next, let's take a look at the money-saving measures for the safety maintenance of membrane structures:
1. Carefully screen the membrane materials: The quality of membrane materials is very important for a membrane structure project. Even the same membrane material, the quality of different manufacturers, different models and even different production batches are different. Actual application It is necessary to carefully select and inspect in detail; the local quality defects of the film material should be skipped during cutting. In addition, the membrane structure adopts metal components to take effective anti-corrosion protection measures; when designing, the section size of the components should be selected in consideration of the effect of rust and leave a margin. As far as possible, use components made of stainless steel.
2. Strictly control fire-fighting facilities: The membrane surface of the membrane structure should minimize the approach of combustible objects to prevent fire damage. Corresponding fire-fighting facilities shall be set up in strict accordance with the requirements of the building design fire protection code.
Third, the quality of the connecting components should be good: the connected components are also an important factor in the tension of the membrane structure. The design of the connecting components ensures that they meet the requirements of mechanical strength and have appropriate safety reserves. The key parts can be considered to be equipped with structural measures such as safety chains, so as to prevent the safety of the entire structure from being compromised in case the connecting piece is damaged.
Fourth, avoid membrane area water design: When designing the membrane surface shape, a larger membrane surface slope should be adopted and the drainage path of the membrane surface should be convenient. Apply the corresponding vertical load on the membrane surface according to the rainfall situation of the project site, and check the contour map of the membrane surface after deformation; if there is an approximate circular or elliptical area outside the high point, the membrane surface should be modified shape. When stretching, the pre-tension of the membrane surface needs to reach the design and tension level; the loose membrane surface should be tensioned twice in time; the water in the membrane area should be assisted in time for manual drainage, and corresponding remedial and modification measures should be taken.
The original text is compiled from Shanghai Shows A Membrane Structure Co., Ltd.