4. Designate a designated person (4 to 8 people) to stop the regular inspection and maintenance of the Bingcheng before the rainy season and winter comes to ensure that the membrane surface and drainage equipment are unobstructed;
5. During and after the severe weather such as strong wind, hail, heavy rain, heavy snow, etc., 4 designated professional technicians will stop the safety inspection of the project to eliminate the hidden dangers in time;
6. One year after the completion of the project, 4 professional technicians are appointed to check whether the membrane structure is in normal working condition. The inspection contents include: whether the membrane surface is greatly deformed, whether the membrane surface is relaxed due to the loss of pretension, and the membrane surface Whether it can be partially torn, whether the coating of the membrane can be peeled off, whether the connecting piece can be loosened, etc
7. Regularly train the designated personnel of the operating unit during the warranty period to ensure that the operating unit can be used normally.
The above are several aspects summarized by the editor, I hope to help everyone.
Original text from Shanghai Shows A Membrane Structure Co., Ltd.
Please indicate